With this ship-to-shore crane, it is not just the container that can be raised and lowered; the entire crane girder can be moved vertically. This significantly shortens the lifting and lowering time. However, the previous energy supply solution with free-hanging cables was very vulnerable as they regularly became tangled in strong winds and had to be untangled again with a considerable effort of up to 30 working hours. The new e-chains from our company, however, guide the cables safely now.
Download case study
This case study illustrates how EMO B.V. is able to achieve over 375,000km on its STS cranes with igus chains for cranes®.